After passing under the Camp Meeting Avenue Bridge, technician starts the hydraulic lift generator to slowly shift the load back to its "original" position. 0958 hours. |
Date:
7/22/2012 |
Location:
Skillman, NJ Map ![Show Skillman on a rail map](/images/map_us.gif) |
Views:
294 |
Collection Of:
![This is one of your favorite contributors](images/star_yellow_small.gif)
Kim Piersol |
Rolling Stock: |
Author: Kim Piersol
|
![Hydraulic Lifts Shifting the Load](http://s3.amazonaws.com/rrpa_photos/81819/DSCF2730rrpix9.jpg) |
Picture Categories: |
This picture is part of album: Air Products 100th Heat Exchanger Move |