CR GP40 3238 leads GP35 2296, U30B 2857 and GP38-2 8070 with a load of piggybacks through Altoona in August, 1977. Higher resolution image. |
Date:
8/7/1977 |
Location:
Altoona(Rose Yard), PA |
Views:
578 |
Collection Of:

Alan Page |
Locomotives: |
Author: Alan Page
|
 |
Picture Categories: Action |
This picture is part of album: Conrail operations at Altoona and Horseshoe Curve in August, 1977. |