With the conductor riding the point making a westward shove back to IKE Siding after pulling the grain train from the Flint Hills Elevator |
Date:
9/22/2024 |
Location:
Abilene, KS Map ![Show Abilene on a rail map](/images/map_us.gif) |
Views:
47 |
Collection Of:
![This is one of your favorite contributors](images/star_yellow_small.gif)
Walt Sharp |
Locomotives: |
Author: Walt Sharp
|
![UP 7756](/pictures\149669\UP7756DPULoadGrainUPRRSalina22Sep2024.JPG) |
Picture Categories: Roster,Transit,Action |
This picture is part of album: 2024 UPRR Salina Subdivision |